Installation

Ultra eco is connected in parallel to the electrical current at any point before or after the electrical distribution board. The Ultra eco solution requires no maintenance and runs 24 hours a day, 365 days a year. Ultra eco is the simplest and safest guaranteed way to reduce energy costs.

3phase

Ultra eco is designed as an open circuit installed in parallel. Ultra eco does not draw any load and does not consume any energy.

Blue Carbon's team of experienced engineers will project manage the installation of Ultra eco from start to finish. Our engineering team manage a UK wide network of experienced electrical engineers to undertake all site surveys and installations.

  • All installations are made by NIC EIC or ECA registered qualified electricians.
  • Ultra eco is installed in accordance with IEE Requirements for Electrical Installations (currently 17th Edition) BS 7671.
  •  Ultra eco is installed within an insulating box and all cabling is protected within an armoured conduit.

Installation is fast, simple and economical. Ultra eco is up to 90% smaller than comparative technologies, making it easy to find a suitable installation point.

alt

alt

about-us 2